AIRO
INSIGHT REPORT

From Compliance to Intelligence

Live environmental data revealing the true behaviour of your ventilation infrastructure.

Kitchen Extract
Parkdean Resorts · Cherry Tree Holiday Park · 4 Sensors · Grease System · Installed Oct 23, 2025
Report Date: 18 March 2026 · Great Yarmouth, Norfolk
Deposit Accumulation Heatmap
Micron deposit levels across all 4 sensors. Colour intensity reflects proximity to fail threshold.
5m from Canopy
(Fan Discharge)
94.80
µm · 19.0% of 500
2.5m from Canopy
(Vertical Riser)
39.50
µm · 7.9% of 500
1m from Canopy
(Riser 2)
31.60
µm · 6.3% of 500
1m from Canopy
(Riser 1)
7.90
µm · 4.0% of 200
0 µm
500+ µm
System Overview

Live System Status

Avg Deposit Level
43.45 µm
Fail at 200 µm · Estimated
Avg Temperature
19.21° C
Critical at 150°C
Compliance Status
Compliant
All sensors within threshold
ALL CLEAR
Max Temp (24 hrs)
47.69° C
Well below 150°C critical threshold
Flammability Index
Highest Temperature Alert
MONITORING
51.56°
Celsius
1m from Canopy (Riser 2) · Sensor ...33206
Peak temperature recorded. The critical flammability threshold for oxidised grease is 150°C (per EN 1366-1 guidance). Current peak is at 34.4% of the critical threshold, well within safe operating parameters.
150°C CRITICAL
Data Insights

Deposit Analysis & Maintenance

Deposit Build-Up Rates

Average daily accumulation per sensor
Fan Discharge (5m)0.38 µm/day (142-day avg)
Vertical Riser (2.5m)0.24 µm/day (142-day avg)
Riser 2 (1m)6.19 µm/day (3-day avg)
Riser 1 (1m)0.06 µm/day (142-day avg)
The Fan Discharge sensor (5m) shows a deposit of 94.80 µm, well within its 500 µm threshold. Riser 2 has a notably high recent build-up rate of 6.19 µm/day over the last 3 days, worth monitoring. Riser 1 remains virtually clean at just 7.90 µm.

Maintenance Forecast

March 2026 · Condition-based
Fan Discharge (5m): At current build-up rate of 0.38 µm/day, this sensor will reach 500 µm fail threshold in approximately 1,068 days from today. No immediate action required.
Currently at 19.0% of threshold
Vertical Riser (2.5m): At 0.24 µm/day, this sensor will reach 500 µm in approximately 1,919 days. Low risk zone.
Currently at 7.9% of threshold
Riser 2 (1m): Recent spike to 6.19 µm/day warrants monitoring. If sustained, could reach 500 µm threshold in approx 76 days.
Currently at 6.3% of threshold · Watch rate trend
Riser 1 (1m): Extremely low accumulation at 0.06 µm/day. This sensor has a lower 200 µm threshold but is at just 4% utilisation. No concern.
Currently at 4.0% of threshold
TRUE VALUE
Full Compliance

All 4 sensors within threshold

Every sensor at Cherry Tree Holiday Park is currently compliant. The highest reading (Fan Discharge at 94.80 µm) is at just 19% of its 500 µm threshold, giving significant headroom before any intervention is needed.

Reduced Cleaning Costs

Clean where and when it matters

Traditional periodic cleaning treats every zone the same, regardless of actual contamination levels. AIRO pinpoints exactly which sensors need attention and when, so you only clean where deposits demand it. This eliminates unnecessary servicing, reduces contractor costs, and ensures every clean is driven by real data rather than a calendar.

Temperature Insight

Safe operating temperatures

All temperature readings are well below the 150°C critical threshold. The highest temperature alert recorded was 51.56°C in the Riser 2 sensor, just 34.4% of the critical flammability point. Average system temperature sits at a comfortable 19.21°C.

Sensor Readings

Micron Deposit Trends

5m from Canopy (Fan Discharge)
Kitchen Extract · Sensor ...18652
19.0% OF THRESHOLD
Micron Reading
94.80 µm
Estimated · Fail at 500 µm
Temperature
12.38° C
Critical at 150°C
500µm Jan 26Feb 09Feb 23Mar 16
Avg Daily Build-Up: 0.38µm (142-day)
Installed: Oct 23, 2025
Floor Level: Roof Void
Ductwork: Spiral
78%
Battery
Stable
Connection
Good
Optics
19.0% of fail thresholdLast: Mar 18, 2026 04:38 GMT
2.5m from Canopy (Vertical Riser)
Kitchen Extract · Sensor ...33479
7.9% OF THRESHOLD
Micron Reading
39.50 µm
Estimated · Fail at 500 µm
Temperature
21.75° C
Critical at 150°C
500µm Jan 26Feb 09Feb 23Mar 16
Avg Daily Build-Up: 0.24µm (142-day)
Installed: Oct 23, 2025
Floor Level: Roof Void
Ductwork: Spiral
79%
Battery
Stable
Connection
Good
Optics
7.9% of fail thresholdLast: Mar 18, 2026 05:51 GMT
1m from Canopy (Riser 2)
Kitchen Extract · Sensor ...33206
COMPLIANT
Micron Reading
31.60 µm
Verified · Fail at 500 µm
Temperature
21.50° C
Critical at 150°C
500µm Jan 26Feb 09Feb 23Mar 16
Avg Daily Build-Up: 6.19µm (3-day)
Installed: Oct 23, 2025
Floor Level: Roof Void
Ductwork: Spiral
85%
Battery
Stable
Connection
Good
Optics
6.3% of fail thresholdLast: Mar 18, 2026 05:03 GMT
1m from Canopy (Riser 1)
Kitchen Extract · Sensor ...33354
COMPLIANT
Micron Reading
7.90 µm
Verified · Fail at 200 µm
Temperature
21.19° C
Critical at 150°C
200µm Jan 26Feb 09Feb 23Mar 16
Avg Daily Build-Up: 0.06µm (142-day)
Installed: Oct 23, 2025
Floor Level: Roof Void
Ductwork: Spiral
91%
Battery
Stable
Connection
Good
Optics
4.0% of fail thresholdLast: Mar 18, 2026 05:21 GMT
Energy Performance

AIRO Energy Efficiency Rating (EER)

Energy Performance Rating

AIRO EER

System: Cherry Tree Kitchen Extract · Last Updated: 18 Mar 2026
A
Green — Good Efficiency
System operating within normal parameters
Avg Grease Level
143 µm
Annual Cost Impact
Baseline
Carbon Impact
Minimal
System Health
All Compliant
A
< 200 µm
B
200-350
C
350-500
D
500-750
E
> 750 µm

Disclaimer: The Energy Efficiency Rating shown above uses illustrative example data for demonstration purposes only. Values may not reflect the actual energy performance of this system. This section is subject to revision or removal as the EER methodology is validated against live operational data.

Platform Roadmap

Coming Soon // Out of Scope Features

These features are in development, all powered by the same ultrasonic micron and temperature sensors already deployed at Cherry Tree Holiday Park.

Coming Soon - Platform Roadmap
Proven at Scale
Trusted by Industry Leaders
AIRO is already deployed and delivering live intelligence at Battersea Power Station and the Houses of Parliament. We are currently onboarding pilot programmes with KFC, Big Mamma Group, and Mitchells & Butlers, expanding our reach across some of the most demanding commercial kitchen environments in the UK and beyond.
BATTERSEA POWER STATION HOUSES OF PARLIAMENT KFC · PILOT BIG MAMMA GROUP · PILOT MITCHELLS & BUTLERS · PILOT